You can reach us by metro/subway (Almaly station), by buses No. 2, 3, 63a, 73, 79, 86, 118, 127 (Furmanov str.), by trolley bus No. 9 (Kabanbay str.) or by car with parking at the State Opera Theatre (110 Kabanbay str.)
Sogrinskaya CHPP - audit and BAT assessment
Soil impact monitoring near Caspian Sea wetlands
Agip N.Caspian Base - sampling with minimal disturbance to Ural Delta wetland wildlifeÂ
Oral Combined Heat and Power Plant Modernisation ESDD
FInished wellhead at the closed waste dump in Almaty for METRO
Opornaya Gas Station ESA - Groundwater well purging to obtain representative sample
National Rail Company HSE capacity building
German PVC pipes with fine filter slots were essential for a monitoring well in fine sediment
ESDD of agricultural holding KazExportAstyk for EBRD
ExxonMobil offshore drilling rig study
Resolving water pollution issues during road construction
PM10/2.5 monitoring with DustTrak DRX near Balkhash Coal Power Plant site
Almaty Financial District EIA
Atash Marine Base construction noise monitoring
Turkesan Region grid upgrade -Â birds electrocution risks reduced by installation of larger insulator diskÂ
Sea sediments contamination and benthos monitoring
Ekibastuz GRES- Assessing health risk from increased air pollution due to expansion
AGIP Marine Base - mosquitos assessment and management program
Medeo-Shymbulak Resort ESIA
Saran Solar Plant - Resolving issue of cattle passages blocking
Halliburton Mud Plant air pollution dispersion modeling
McDermott Base sampling and analysis plan for EIA
KazExportAstyk agricultural holding due diligence:Ukraine port facilities
Protection of heritage from damage during mine tailings construction
Kazavtozhol Corporate ESDD within Toll Roads Introduction FS
Kapchagay Residences and Resort
Finding ways to reduce chemical plant impact to vulnerable Crimea tatars community
Due diligence for two KazNefteKhim railway oil terminals - handling illegal settlers
Shelek Wind Farm - visual impact modeling
Haileybury School EIA and Noise Survey
You can reach us by metro/subway (Almaly station), by buses No. 2, 3, 63a, 73, 79, 86, 118, 127 (Furmanov str.), by trolley bus No. 9 (Kabanbay str.) or by car with parking at the State Opera Theatre (110 Kabanbay str.)
Changing from grain warehouse storage to automated silos reduced waste and improved hygiene and working conditions
Apartment complex EIA, Atyrau
Satimola Borite Mine ESIA - community impact assessment
Solving safety issues at the bridges construction
Atash Marine Base: Air pollution monitoring
Burnoye Solar Plant - resolving impact of pasture land reduction
Difusion tubes helped provide continuous picture of air quality around Balkhash Power Plant
Investigation of old Almaty dump for Metro store construction
Sampling for contamination to 5m depth at an old petrol station
National Railway ES Capacity Building - improving public safety
MOBY boat yard ESDD - addressing noise at residential area and grit escape into the sea
Due diligence of Kulan solar plant identified increased risk of adjacent village flooding
Risk of leakage from abandoned oil wells near the Caspian sea
Modern high capacity flour mills made space available in the elevators for small farmers harvest
Opornaya gas compressor station shop demolition staff health hazard from asbestos containing waste
Replanting Greig tulips from the solar power station construction site
Metro Atyrau: old helicopter plant
Metro Karaganda: old air strip
Metro Pavlodar: old petrol stations contamination and flood risk
Satimola Borite Mine ESIA - Socio-economic assessment according the Equator Principles
Shymkent Highway Reconstruction ES Assessment
Philip Morris Almaty Plant phenols effluents bringing to compliance
Road traders resettlement - considering interests of all involved
Shaulder Irrigation System rehabilitation - desalination small farmers fields by improving drainage
Zhambyl Gips ESDD - resolving safety issues at the rock crucher
Pavlodar Chemical Plant chlorine and caustic soda membrane shop construction assessment for EBRD
Assessment of risk of oil hauling by trucks to the railway terminal along the Sagyz River Valley
Introduction of zoning to factory floor
Noise and traffic survey for Haileybury School EIA, Almaty
Shu Irrigation System rehabilitation - considering interests of small farmers